Starting operation of DPW Pumping Station

On 14th January 2019, the Pumping Station built by DPW started to pump Qatra Treated Effluent to the Al Bridi Reserve. The 47 km long, 600mm diameter pipeline requires several days to fill before reaching its destination. The excellent quality of Treated Effluent produced by the plant will ensure healthy growth in landscaped areas at the Al Bridi reserve.